Technical Documentation

No documents found. The documentation may not be available or be restricted.

Interested in this product?

We are at your disposal, do not hesitate in contacting us.

Contacts

Preparation and Application

Concrete: the concrete should be allowed to have a minimum 28 days to harden, a minimal tensile strength of 1.5 N/mm² and a minimum compression resistance of 25 N/mm². The surface must be clean, dry, free from laitance, old paints and other contaminants.

Self-Protection Asphalt Screens with Mineral and Asphalt: the surface must be well adherent, clean, dry and free from oils, grease, dust and other contamination. Wash the surface with neutral detergents, followed by washing with clean high pressure water.

For more information see the Technical DataSheet or contact us.